A. JUR GSF a 300 ft drilling unit
This unit was in cold storage for two years in Malaysia and various Engineering scopes were carried out for reactivating the rig.
- Fast Rescue craft installation
- Helifuel Tank Storage
- Extension of Accommodation deck to install an Accommodation container
- 60T SWL Panama chock on port & stbd side
- Gymnasium
- Choke & Kill line platform
- Crew Baggage iwo Helideck
- Substructure repair plan & FE analysis
- Shaker Deck analysis
- Centrifuge Deck analysis
B. JUR GSF a 300 ft drilling unit
JUR CD a Marathon Letourneau 116C design jackup drilling unit built in year 1992 required a number of modifications for deployment in the field.
Works carried out
- Strength Calculation of Platform for the loads of OSUPA unit
- Calculation of SWL of Trolley Beams of BOP
- Trolley Beam in pump room
- Installation of Escape route from derrick
- Installation of a walkway to reach Monkey Board